locality | Havlíčkův Brod |
investor | Town of Havlíčkův Brod |
term | 12.2019 - 12.2020 |
Newly built kindergarten on the premises of Konečná Primary School in Havlíčkův Brod. It is a two-storey building, which includes 3 new departments as well as a kitchen and canteen. The new kindergarten will accommodate 64 children. All connections, paved areas and playgrounds, including all play elements, were also part of the scope of our project. The project was ordered by the town of Havlíčkův Brod.
locality | Puklice |
investor | Obec Puklice |
term | 2020 |
Building permit, including engineering activities related to the issuance of a building permit
Complete design documentation
Authorial supervision
locality | Puklice |
investor | Puklice |
term | 2020 |
Building permit, including engineering activities related to the issuance of a building permit
Complete design documentation
Authorial supervision
locality | Jičín |
investor | Město Jičín |
term | 2020 - 2021 |
Building permit, including engineering activities related to the issuance of a building permit
Complete design documentation
Authorial supervision
locality | Prague |
investor | K A M A spol. s r.o. |
term | 4.2019 - 5.2020 |
Our company successfully completed the reconstruction and superstructure of the headquarters building for the K A M A spol. s r.o. company in Prague.
The work was divided into two phases. Within the scope of the first phase, which was completed regardless of the Client’s full operations at the time, the superstructure of the 2nd -floor production and administrative parts of the building was completed. The building was completed insulated and a wooden façade was added to the administrative space. Operations were then partially transferred to the newly built floor and, as part of the second phase of the work, the existing areas on the 1st floor, including the company store, were reconstructed at the same time.
locality | Pardubice |
investor | |
term | 3.2020 - 9.2020 |
Our company successfully completed the construction of a new building as part of the PET/CT workplace of the Pardubice Regional Hospital. As an addition to the workplace, new areas were built, including a waiting room, a patient prep area, employee day-rooms, a CT examination room, storage areas, a physician’s workroom, an office, and social facilities. The following rooms were also completed for the functionality of the local departments: radiopharmaceutical reception, material filter, drug preparation, application room, drug control, and personnel filter.
This project took 6 months to complete.
locality | Hradec Králové |
investor | Statutární město Hradec Králové |
term | 2019 - 2020 |
Building permit, including engineering activities related to the issuance of a building permit
Complete design documentation
Authorial supervision
locality | Prague |
investor | KODYS, spol. s r.o. |
term | 4.2019 - 1.2020 |
Our company, RONELI Construction SE, completed work on the “New Headquarters for the KODYS, spol. s r.o. Company”.
The company’s original administrative building could be found on a plot situated in Prague 5, next to Motol Castle. This building was completely demolished and a new, modern three-storey headquarters for the KODYS company was built in its place.
Apart from the demolition of the previous building and the construction of its replacement, part of our commission also included securing network hook-ups as well as the construction of access roads, 25 parking spots, and asphalt paving.
locality | Prostějov |
investor | Očenášek - Mikulka, spol. s r.o. |
term | 9.2019 - 3.2020 |
Our company successfully completed work on the commission “Energy Savings at the Očenášek - Mikulka, spol. s r.o. Compound”. Over six months, the construction of three production halls in the industrial park located on the edge of Prostějov was completed. Part of this project included updating the perimeter and roof covering, including the auxiliary steel construction and roofing components, the thermal insulation structure, the exterior filler openings, and the installation of a new lightning rod. This project was unique in that the work was carried out regardless of the full operation of the Client and their tenants.
locality | Hradec Králové |
investor | MONTS s.r.o. |
term | 8.2018 - 11.2019 |
Our company completed the construction of a new industrial hall, including an administrative extension, for the company MONTS s.r.o. in Hradec Králové.
Apart from the hall and the administrative sections, part of the work completed by our company also included the construction of roads on the premises, asphalt paving, the relocation of tracks/network hook-ups, and the construction of an outdoor stationary crane and railway tracks.
The project was unique in that both the administrative area and the hall were designed according to the Passive House Standard.
Construction was completed in accordance with the contractual work schedule and it took 13 months to finish.
locality | Dobré |
investor | Obec Dobré |
term | 2020 |
Zoning permit, including engineering activities related to the issuance of a zoning permit.
Building permit, including engineering activities related to the issuance of a building permit.
locality | Opatovice nad Labem |
investor | Opatovice nad Labem |
term | 2019 |
Building permit, including engineering activities related to the issuance of a building permit.
locality | Obec Dušejov |
investor | PWB hb s.r.o. |
term | 2019 |
Complete design documentation
locality | Třebechovice nad Orebem |
investor | Královéhradecký kraj |
term | 7/2019 - 12/2019 |
Construction survey
Zoning and building permits, including engineering activities related to the issuance of a building permit.
Complet design documentation
Authorial supervision
locality | Stonařov |
investor | Městys Stonařov |
term | 5/2019 - 11/2019 |
Conceptional survey
Building permit, including engineering activities related to the issuance of a building permit
Complete design documentation
locality | Sendražice |
investor | Město Kolín |
term | 2019 |
Conceptional survey
Building permit, including engineering activities related to the issuance of a building permit
Documentation for selecting a contractor
locality | Havlíčkův Brod |
investor | Město Havlíčkův Brod |
term | 8.2018 - 4.2019 |
The company RONELI SE successfully completed the construction-related commission, “Reconstruction of the Nuselská Primary School in Havlíčkův Brod”. This commission entailed the renovation of the 5th floor and the reconstruction of several existing classrooms on the 4th floor of the school.
Thus the school received a new digital planetarium, a natural sciences classroom, and a multifunctional classroom with a 2D projector. Part of the original floor plan of the roof was turned into an outdoor study area, part of which includes a greenhouse and space for watching the stars.
All the work was completed while school was in session, and in combination with the character of the commission, great emphasis was placed on, among other things, the safety not only of our employees but primarily the safety of the children and the employees of the school.
locality | Opatovice nad Labem |
investor | Obec Opatovice nad Labem |
term | 6.2018 - 6.2019 |
Our company completed the construction of a new central pavilion for the Primary School in Opatovice nad Labem. The central pavilion connects the 4 existing school buildings, creating a single primary entrance onto the grounds. Central lockers were built for the students on the first floor, and four new basic classrooms and one language skills lab were built on the 2nd and 3rd floors. Thus, operationally speaking, the central pavilion became the traffic heart of the school. The fact that it includes barrier-free access goes without saying. This commission took 11 months to finish.
locality | Havlíčkův Brod |
investor | Město Havlíčkův Brod |
term | 2/2019 - 6/2019 |
Conceptional survey
Building permit, including engineering activities related to the issuance of a building permit
Complete design documentation
locality | Praha 4 |
investor | Rezidence Stříbrná zahrada s.r.o. |
term | 6/2018 – 8/2019 |
Survey
Design for combined zoning and building permits
Engineering activities combined with obtaining the building permit
Complete design documentation
RONELI Holding a.s.
Registered office: Vinohradská 2828/151, 130 00 Prague 3 – Žižkov
Phone: +420 777 676 020
Cookie policy
Id. No.: 075 49 407
Tax Id. No. CZ 075 49 407