Puklice Gym

locality Puklice
investor Obec Puklice
term 2020

Building permit, including engineering activities related to the issuance of a building permit

Complete design documentation

Authorial supervision

Extension of the Primary School in Puklice

locality Puklice
investor Puklice
term 2020

Building permit, including engineering activities related to the issuance of a building permit

Complete design documentation

Authorial supervision

Jičín sports hall

locality Jičín
investor Město Jičín
term 2020 - 2021

Building permit, including engineering activities related to the issuance of a building permit

Complete design documentation 

Authorial supervision

K A M A headquarters

locality Prague
investor K A M A spol. s r.o.
term 4.2019 - 5.2020

Our company successfully completed the reconstruction and superstructure of the headquarters building for the K A M A spol. s r.o. company in Prague.

The work was divided into two phases. Within the scope of the first phase, which was completed regardless of the Client’s full operations at the time, the superstructure of the 2nd -floor production and administrative parts of the building was completed. The building was completed insulated and a wooden façade was added to the administrative space. Operations were then partially transferred to the newly built floor and, as part of the second phase of the work, the existing areas on the 1st floor, including the company store, were reconstructed at the same time. 

K A M A headquarters

PET/CT workplace, Pardubice Regional Hospital

locality Pardubice
investor
term 3.2020 - 9.2020

Our company successfully completed the construction of a new building as part of the PET/CT workplace of the Pardubice Regional Hospital. As an addition to the workplace, new areas were built, including a waiting room, a patient prep area, employee day-rooms, a CT examination room, storage areas, a physician’s workroom, an office, and social facilities. The following rooms were also completed for the functionality of the local departments: radiopharmaceutical reception, material filter, drug preparation, application room, drug control, and personnel filter.

This project took 6 months to complete.

PET/CT workplace, Pardubice Regional Hospital

Úprkova Primary School

locality Hradec Králové
investor Statutární město Hradec Králové
term 2019 - 2020

Building permit, including engineering activities related to the issuance of a building permit

Complete design documentation

Authorial supervision

KODYS, spol. s r.o. headquarters

locality Prague
investor KODYS, spol. s r.o.
term 4.2019 - 1.2020

Our company, RONELI Construction SE, completed work on the “New Headquarters for the KODYS, spol. s r.o. Company”.  

The company’s original administrative building could be found on a plot situated in Prague 5, next to Motol Castle. This building was completely demolished and a new, modern three-storey headquarters for the KODYS company was built in its place.

Apart from the demolition of the previous building and the construction of its replacement, part of our commission also included securing network hook-ups as well as the construction of access roads, 25 parking spots, and asphalt paving. 

KODYS, spol. s r.o. headquarters

Reconstruction of the production halls for the Očenášek - Mikulka, spol. s r.o. company

locality Prostějov
investor Očenášek - Mikulka, spol. s r.o.
term 9.2019 - 3.2020

Our company successfully completed work on the commission “Energy Savings at the Očenášek - Mikulka, spol. s r.o. Compound”. Over six months, the construction of three production halls in the industrial park located on the edge of Prostějov was completed. Part of this project included updating the perimeter and roof covering, including the auxiliary steel construction and roofing components, the thermal insulation structure, the exterior filler openings, and the installation of a new lightning rod. This project was unique in that the work was carried out regardless of the full operation of the Client and their tenants.

Reconstruction of the production halls for the Očenášek - Mikulka, spol. s r.o. company

Completion of a hall for MONTS s.r.o.

locality Hradec Králové
investor MONTS s.r.o.
term 8.2018 - 11.2019

Our company completed the construction of a new industrial hall, including an administrative extension, for the company MONTS s.r.o. in Hradec Králové.
Apart from the hall and the administrative sections, part of the work completed by our company also included the construction of roads on the premises, asphalt paving, the relocation of tracks/network hook-ups, and the construction of an outdoor stationary crane and railway tracks.
The project was unique in that both the administrative area and the hall were designed according to the Passive House Standard.
Construction was completed in accordance with the contractual work schedule and it took 13 months to finish.

Completion of a hall for MONTS s.r.o.

Dobré Primary School

locality Dobré
investor Obec Dobré
term 2020

Zoning permit, including engineering activities related to the issuance of a zoning permit.

Building permit, including engineering activities related to the issuance of a building permit.

Sauna reconstruction

locality Opatovice nad Labem
investor Opatovice nad Labem
term 2019

Building permit, including engineering activities related to the issuance of a building permit.

Multipurpose play area reconstruction

locality Obec Dušejov
investor PWB hb s.r.o.
term 2019