References

locality
investor
term 2019

locality
investor
term 2019

locality
investor
term 2019

locality
investor
term 2019

locality
investor
term 8.2018 - 4.2019

locality
investor
term 6.2018 - 6.2019

locality
investor
term 2/2019 - 6/2019

locality
investor
term 6/2018 – 8/2019

locality
investor
term 5/2017 – 1/2019

locality
investor
term 4/2017 - 1/2019

locality
investor
term 1.2018 - 12.2018

Reconstruction of a catering facility and roof cladding of a production hall

locality Pilsen, CZ
investor DRIESSEN Czech s.r.o.
term 02.2018 – 06.2018

Our company has successfully completed the “Reconstruction of the catering facility and roof cladding” at DRISSEN Czech s.r.o. in Pilsen. The part of the contract entrusted to our company included a complete reconstruction of the interior of the catering facility, the delivery of the kitchen equipment and the reconstruction of 5000 m2 of the roof cladding of the production hall.

Reconstruction of a catering facility and roof cladding of a production hall

Construction of a development and testing centre

locality Klecany, CZ
investor Avaps s.r.o.
term 11.2017 – 03.2018

The building, designed as a single-storey steel structure clad in sandwich panels and with a saddle roof will be used for the development and testing of new products. Besides the furnace, the hall also features a two-storey block housing a control room, changing rooms with sanitary facilities, and a training room. About 1500 m2 of new paved areas have been built around the test centre. The project was completed in four months, with most of the work having been done in winter.

Construction of a development and testing centre

Reconstruction and completion of the Impact Hub co-working centre in Brno

locality Brno, CZ
investor Impact Hub Brno
term 05.2017 – 12.2017

Our company has completed an extensive reconstruction of the Impact Hub Brno facility, where new offices and conference rooms with an area of more than 1700 m2 were built. As a result, Impact Hub Brno has become the largest shared space in Europe and the second largest shared space of the Impact Hub network in the world.

Reconstruction and completion of the Impact Hub co-working centre in Brno

Reconstruction of Pavilion E of the Hamza Specialised Rehabilitation Centre for Children and Adults

locality Košumberk, CZ
investor Hamza Specialised Rehabilitation Centre for Children and Adults
term 05.2017 – 11.2017

As the name suggests, the project was aimed at the enhancement of Pavilion E of the Hamza Specialised Rehabilitation Centre for Children and Adults. The pavilion is now used as a children’s ward. The reconstruction carried out by our company was completed in five months.

Reconstruction of Pavilion E of the Hamza Specialised Rehabilitation Centre for Children and Adults

Construction of a production hall for AVAPS

locality Klecany, CZ
investor AVAPS s.r.o.
term 04.2017 – 09.2017

This was a contract for the construction of a new two-bay production hall with a total usable area of 2376 m2, connected to the existing office building. The building is used for the production of fire shutters and smoke barriers. The western bay is single-storey and the eastern bay is partly two-storey, with an office block and a surface treatment line. The construction project was completed in five months.

Construction of a production hall for AVAPS

Reconstruction of laboratories

locality Kutná Hora, CZ
investor Philip Morris ČR a.s.
term 04.2017 – 06.2017

The comprehensive reconstruction of the laboratories of Philip Morris ČR a.s. in Kutná Hora included the replacement of all installations and the realisation of new surface finishes and assemblies. In this contract, we coped successfully with a large volume of work on a relatively small ground plan, which placed high demands on the coordination of individual activities.

Reconstruction of laboratories

Real Estate project - 4 luxurious apartments

locality Prague 2, CZ
investor Apartments Wenzigova s.r.o.
term 2016 - 2018

The residence “Apartments Wenzigova” is a unique project in a highly exclusive locality in Prague, which visually preserves the original neoclassical architectural style and combines it with modern facilities and design. The development offers highest quality living at a safe location in downtown Prague. Residence Wenzigova 19 is a unique developer project, which will rise right in the heart of the state capital in Vinohrady.

Apartment layouts 2 bdrms + kitchenette 99.8 m2, studio+ kitchenette 30.16m2, 2 brdms + kitchenette 111.6m2 + 23.88m2 

Real Estate project - 4 luxurious apartments

Office building – DRIESSEN CZECH s.r.o.

locality Plzeň, CZ
investor Driessen Czech s.r.o.
term 8.2016 - 1.2017

Our company is currently implementing the construction of an office building, including an enhancement of the transformer station and a repair of the central station system in Pilsen. This contract is undertaken for Driessen Czech s.r.o., a multinational company.

The structure is designed as a mirror image of the existing office part of a hall erected within Stage II of the construction, with the dimensions of 23x12.5 m and two floors in the western part, finished with a three-storey glazed tower.

Office building – DRIESSEN CZECH s.r.o.

Welding warehouse - Charvát CTS a.s.

locality Okřínek, CZ
investor CHARVÁT CTS a.s.
term 07.2016 – 10.2016

Our company has performed an on-schedule completion of the extension of the Charvát CTS a.s. welding factory in Okřínek near Poděbrady, as per the Contract for Work. The construction of a new production factory with office premises and the renovation of the existing building worth CZK 18.5 million were completed in a mere 110 days. The production factory, with an area of 910 m2, will be used as a welding site for the production of engineering products.

Welding warehouse - Charvát CTS a.s.